- 1912 or +91471 2555544

Download details
Special Scheme for regularising connected load - Reopening the Scheme period from 1/8/2019 to 31/10/2019 Special Scheme for regularising connected load - Reopening the Scheme period from 1/8/2019 to 31/10/2019 HOT

Special Scheme for regularising connected load - Reopening the Scheme period from 1/8/2019 to 31/10/2019 - Sanctioned.

Data

Size960.75 KB
Downloads11,842
Created05-08-2019
Changed25-11-2020

Download