1 | KALLADA HYDRO ELECTRIC PROJECT | ||||||||||
The Kallada power station utilises the water release from Kallada Irrigation Reservoir. Kallada power station is the first of its kind in Kerala in utilising the water for irrigation release for power generation. The dam is owned by the Irrigation Department . After power generation, water from the power station is released to the Kallada River. From there it is diverted to irrigation canal by diversion weir during irrigation seasons The Power generated in the station is evacuated through two 66 kV feeders. | |||||||||||
Kallada Reservoir | |||||||||||
Water Spread Area | 13.72 Sq. Km. | ||||||||||
Catchment Area | 549.52 Sq. Km. | ||||||||||
Average Rainfall | 3098 mm | ||||||||||
Full Reservoir Level (FRL) | 115.82 m | ||||||||||
Minimum Drawdown level (MDDL) | 78 m | ||||||||||
Effective Storage at FRL | 472 MCM | ||||||||||
Energy Equivalent at FRL | 48.41 MU | ||||||||||
KALLADA POWER STATION | |||||||||||
Location | Dam toe of Kallada Irrigation Dam | ||||||||||
Village | Thenmala | ||||||||||
Taluk | Punalur | ||||||||||
District | Kollam | ||||||||||
Installed capacity | 15 MW ( 2x7.5 MW) | ||||||||||
Firm Annual Generation Capablity | 65 MU | ||||||||||
Prime mover | Vertical shaft Keplan | ||||||||||
Avearge net effective head | 43m | ||||||||||
Water required for 1 MU generation | 9.75 MCM | ||||||||||
Full load discharge of 1 machine | 20.32 m3/ Sec | ||||||||||
Unit | Rating | Date of Commssioning | |||||||||
U # 1 | 7.5 MW | 05.01.1994 | |||||||||
U # 2 | 7.5 MW | 05.09.1994 | |||||||||
Generation in Mu for the last six years from Kallada Power station | |||||||||||
Year | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 | 2014-15 | |||||
Generation in MU | 60.41 | 72.250 | 65.62 | 21.81 | 67.76 | 68.99 | |||||
2 | PEPPARA SMALL HYDRO ELECTRIC PROJECT | ||||||||||
The reservoir for the project is formed by Peppara Dam across Karamana river owned by Kerala Water Authority .Tail race dischrge: After power generation, water from the power station is released to the Karamana River and collected at Aruvikkara dam for domestic water supply to Thiruvananthpuram city .The Power generated in the station is at 11 kV and is directly connected to the 11 kV feeder to 66 kV Palode Substation. | |||||||||||
PEPPARA DAM | |||||||||||
Water Spread Area | 8.496 Sq. Km. | ||||||||||
Catchment Area | 86 Sq. Km. | ||||||||||
Full Reservoir Level (FRL) | 110.5 m | ||||||||||
Minimum Drawdown level (MDDL) | 82.25 m | ||||||||||
Effective Storage at FRL | 68.4 MCM | ||||||||||
Energy Equivalent at FRL | 3.5 MU | ||||||||||
PEPPARA POWER STATION | |||||||||||
Place | Peppara | ||||||||||
Village | Vithura | ||||||||||
Taluk | Nedumangad | ||||||||||
District | Thiruvananthapuram | ||||||||||
Installed capacity | (1 x 3 MW)= 3 MW | ||||||||||
Annual Generation capablity | 11.50 Mu | ||||||||||
Prime mover | S type Kaplan | ||||||||||
Average net effective head | 25 metre | ||||||||||
water required for 1 MU generation | 19.55 MCM | ||||||||||
Full load dischage | 16.30 m3 / Sec | ||||||||||
Unit | Rating | Date of Commssioning | |||||||||
U # 1 | 3 MW | 15.06.1996 | |||||||||
Generation in Mu for the last six years from Peppara Power stations | |||||||||||
Year | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 | 2014-15 | |||||
Generation in MU | 6.04 | 9.75 | 8.19 | 3.69 | 7.59 | 5.37 | |||||
3 | LOWER MEENMUTTI SMALL HYDRO ELECTRIC PROJECT | ||||||||||
The reservoir for the project is formed by Lower Meenmuuty weir across Vamanapuram river in Kallar basin.The power generation is at 3.3 kV. This is stepped up to 11 kV and transmitted to 66 kV substation Palode. After power generation, water from the power station is released to the Vamanapuram River. | |||||||||||
LOWER MEENMUTTY WEIR | |||||||||||
Catchment Area | . | 102.4 Sq. Km | |||||||||
Average Rainfall | 3138 mm | ||||||||||
Full Reservoir Level (FRL) | 62.75 m | ||||||||||
Minimum Drawdown level (MDDL) | 61.3 m | ||||||||||
LOWER MEENMUTTY POWER STATION | |||||||||||
Place | Lower Meenmutty | ||||||||||
Village | Palode | ||||||||||
Taluk | Nedumangad | ||||||||||
District | Thiruvananthapuram | ||||||||||
Installed capacity | (1 x 0.5MW +2 x1.5 MW)= 3.5 MW | ||||||||||
Annual Generation capablity | 7.63MU | ||||||||||
Prime mover | Horizontal S type Full Kaplan | ||||||||||
Aveage net effective head | 13 metre | ||||||||||
water required for 1 MU generation | 35.9 MCM | ||||||||||
Full load dischage | 14.98 m3 / Sec for 1.5 MW machine | ||||||||||
Full load dischage | 4.99m3/ sec for 0.5 MW machine | ||||||||||
Unit | Rating | Date of Commssioning | |||||||||
U # 1 | 0.5 MW | 11.08.2006 | |||||||||
U # 2 | 1.5 MW | 05.06.2006 | |||||||||
U # 3 | 1.5 MW | 02.05.2006 | |||||||||
Generation in Mu for the last six years from Lower Meenmutty Power stations | |||||||||||
Year | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 | 2014-15 | |||||
Generation in MU | 3.42 | 7.19 | 4.86 | 2.15 | 5.41 | 5.75 | |||||
4 | PEECHI SMALL HYDRO ELECTRIC PROJECT | ||||||||||
The Peechi Dam under Irrigation Department constructed across Manali river makes the reservoir for this project. Generation is from the water released for irrigation. Hence generation is pnly in the irrigation seasons only. The power generation is at 3.3 kV. This is stepped up to 11 kV and transmitted over two 11 kV feeders. | |||||||||||
PEECHI Reservoir | |||||||||||
Water Spread Area | 12.95 Sq. Km. | ||||||||||
Full Reservoir Level (FRL) | 79.25 m | ||||||||||
Minimum Drawdown level (MDDL) | 68.8 m | ||||||||||
Effective Storage at FRL | 112.607 MCM | ||||||||||
Energy Equivalent at FRL | 3.21 MU | ||||||||||
PEECHI POWER STATION | |||||||||||
Location | Peechi dam toe | ||||||||||
Village | Peechi | ||||||||||
Panchayath | Panacherry | ||||||||||
Taluk | Thrissur | ||||||||||
District | Thrissur | ||||||||||
Installed capcity | 1 x 1.25 MW | ||||||||||
Firm annual design energy | 3.31 MU | ||||||||||
Average net head | 22.75 metre | ||||||||||
Prime mover | Horizontal shaft Keplan | ||||||||||
Water required for 1 MU generation | 18.172 MCM | ||||||||||
Full load dischage | 6.31 m3 / Sec | ||||||||||
Date of commissioning of the unit 7-1-2013 | |||||||||||
Generation in Mu for the last 3 years from Peechi SHEP | |||||||||||
Year | 2012-13 | 2013-14 | 2014-15 | ||||||||
Genearion in Mu | 0.263 | 3.284 | 1.924 | ||||||||
5 | POOZHITHODE SMALL HYDRO ELECTRIC PROJECT | ||||||||||
The waters of Illyanipuzha and Kadantharappuzha are utilised for the project. Overflow type diversion weir is constructed across the river. The Power generated in the station is at 3.3 kV. This is stepped up to 33 kV for evacuation. | |||||||||||
Poozhithode weir | |||||||||||
Catchment Area | 26 Sq. Km. | ||||||||||
Average Rainfall | 4706 mm | ||||||||||
Full Storage Level | 270.21 m | ||||||||||
Minimum Drawdown level (MDDL) | 266.71 m | ||||||||||
Poozhithode Power Station | |||||||||||
Village | Maruthonkara | ||||||||||
Panchayath | Maruthonkara | ||||||||||
Taluk | Vadakara | ||||||||||
District | Kozhikode | ||||||||||
Installed capcity | 3 x 1.6 MW=4.8 MW | ||||||||||
Annual generation capability | 10.97 MU | ||||||||||
Prime mover | Horizontal shaft Francis | ||||||||||
Average net head | 72m | ||||||||||
water required for 1 MU generation | 8.67 MCM | ||||||||||
Full load discharge of 1 machine | 3.85m3/ Sec | ||||||||||
Unit | Rating | Date of commissioning | |||||||||
U # 1 | 1.6 MW | 25-6-2011 | |||||||||
U # 2 | 1.6 MW | 25-6-2011 | |||||||||
U # 3 | 1.6 MW | 25-6-2011 | |||||||||
Generation in Mu for the last 4 years from Poozhithode SHEP | |||||||||||
Year | 2011-12 | 2012-13 | 2013-14 | 2014-15 | |||||||
Genearion in Mu | 9.362 | 10.670 | 11.969 | 11.329 | |||||||
6 | VILANGAD SMALL HYDRO ELECTRIC PROJECT | ||||||||||
The Station has 3 units of 2.5 MW (Installed capacity - 7.5 MW). The project uses water of the Kavadi puzha and Vaniyam puzha, both tributaries of Mahe river. After power generation, water from the power station is released to the Vaniampuzha river which finaly reaches Mahe river. The power generation is at 3.3 kV. This is stepped up to 33 kV and transmitted to 110 kV Nadapuram substation through 33 kV UG cable. | |||||||||||
Weir | |||||||||||
No of weirs | 2 ( in Vaniampuzha & in Kavadippuzha) | ||||||||||
Catchment Area | 38.6 Sq. Km. | ||||||||||
Average Rainfall | 3851 mm | ||||||||||
Location | Vilangad | ||||||||||
Village | Vilangad &Thinur | ||||||||||
Panchayath | Vanimel and Narippatta | ||||||||||
Taluk | Vadakara | ||||||||||
District | Kozhikode | ||||||||||
Installed capacity | 3 x 2.5 MW=7.5 MW | ||||||||||
Firm annual generation capability | 22.63MU | ||||||||||
Prime mover | Horizontal Francis | ||||||||||
Average net effective head at power house | 99m | ||||||||||
Water required for 1 MU generation | 4.14 MCM | ||||||||||
Full load discharge | 2.875 m3/ Sec | ||||||||||
Unit | Rating | Date of Commssioning | |||||||||
U # 1 | 2.5 MW | 01.09.2014 | |||||||||
U # 2 | 2.5 MW | 01.09.2014 | |||||||||
U # 3 | 2.5 MW | 01.09.2014 | |||||||||
Generation in Mu for the last year from Vilangad Power station | |||||||||||
Year | 2014-15 | ||||||||||
Genearion in Mu | 7.16 | ||||||||||
7 | MALAMPUZHA SMALL HYDRO ELECTRIC PROJECT | ||||||||||
Located at Malampuzha in Palakkad Taluk of Palakkad District. Malampuzha dam constructed across Malapuzha river forms the reservoir for this project. The station utilises the irrigation release for the left bank canal together with spill. The 2.5 MW machine is usually operated during the period November - January. The annual generation potential is 5.6 MU. Turbine is horizontal shaft Kaplan. The machine was commissioned on 26.11.2001. The dam is owned by Irrigation Department . The water released for Irrigation is used for generation.The power generation is at 11 kV and distributed through 1 No 11 k.V feeder | |||||||||||
MALAMPUZHA DAM | |||||||||||
Water Spread Area | 22.01 Sq. Km. | ||||||||||
Catchment Area | 147.63 Sq. Km. | ||||||||||
Full Reservoir Level (FRL) | 115.09 m | ||||||||||
Minimum Drawdown level (MDDL) | 99.5 m | ||||||||||
Effective Storage at FRL | 236.7 MCM | ||||||||||
Malampuzha Power Station | |||||||||||
Location | Malampuzha Garden | ||||||||||
Village | Malamapuzha - II | ||||||||||
Taluk | Palakkad | ||||||||||
District | Palakkad | ||||||||||
Installed Capacity | 1X2.5 MW= 2.5 MW | ||||||||||
Firm annual generation capability | 5.6 MU | ||||||||||
Avaerage net effective head | 14.4m | ||||||||||
Prime mover | Horizontal Kaplan | ||||||||||
Water required for 1 MU generation | 28.24 MCM | ||||||||||
Generation in Mu for the last five years from Malampuzha Power station | |||||||||||
Year | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 | 2014-15 | |||||
Genearion in Mu | 0.00 | 0.00 | 2.77 | 1.903 | 4.361 | 5.19 | |||||
8 | URUMI -I SMALL HYDRO ELECTRIC PROJECT | ||||||||||
Urumi weir | |||||||||||
River | Eruvanchippuzha | ||||||||||
type | Trench type, Diversion weir | ||||||||||
Catchment area | . | 16.67 sq. km | |||||||||
Location | Poovaranthode/ Urumi | ||||||||||
Village | Koodaranji | ||||||||||
Panchayath | Koodaranji | ||||||||||
Post office | Kuliramvetty P.O | ||||||||||
Taluk | Kozhikode | ||||||||||
District | Kozhikode | ||||||||||
River | Poovaranthode; Overflow weir | ||||||||||
Installed Capacity | 3.75 MW (3 x 1.25 MW) | ||||||||||
Annual generation capablity | 9.72 MU | ||||||||||
Prime mover | Horizontal Francis Turbine | ||||||||||
Average head at power house | 96.5 m | ||||||||||
Water required for 1 MU generation | 4.47 MCM | ||||||||||
Full load dischrge of 1 machine | 1.553 m3/Sec | ||||||||||
Unit | Rating | Date of Commssioning | |||||||||
U # 1 | 1.25 MW | 25.01.2004 | |||||||||
U # 2 | 1.25 MW | 25.01.2004 | |||||||||
U # 3 | 1.25 MW | 25.01.2004 | |||||||||
After power generation, water from the power station is utilised for Urumi II. The Power generated in the station is at 6.3 kV. This is stepped up to 33 kV and transmitted to 110 kV substation, Agasthyamoozhy. | |||||||||||
Generation in Mu for the last four years from Urumi-1 Power station | |||||||||||
Year | 2011-12 | 2012-13 | 2013-14 | 2014-15 | |||||||
Genearion in Mu | 8.29 | 6.655 | 8.599 | 8.068 | |||||||
9 | URUMI -II SMALL HYDRO ELECTRIC PROJECT | ||||||||||
Urumi -2 weir | |||||||||||
River | Eruvanchippuzha | ||||||||||
type | Trench type, Diversion weir | ||||||||||
URUMI -II POWER STATION | |||||||||||
Location | Poovaranthode/ Urumi | ||||||||||
Village | Thiruvambady | ||||||||||
Panchayath | Thiruvambady | ||||||||||
Post office | Punnackal P.O | ||||||||||
Taluk | Kozhikode | ||||||||||
District | Kozhikode | ||||||||||
River | Poyilingappuzha; Overflow weir | ||||||||||
Installed capacity | 3 x0.8 MW=2.4 MW | ||||||||||
Annual generation capablity | 6.28 MU | ||||||||||
Prime mover | Horizontal shaft Francis | ||||||||||
Average head at power house | 55 m | ||||||||||
Water required for 1 MU generation | 7.98 MCM | ||||||||||
Full load discharge of 1 machine | 1.77m3/ Sec | ||||||||||
The units were commissioned on 25.01.2004 | |||||||||||
Unit | Rating | Date of Commssioning | |||||||||
U # 1 | 0.8 MW | 25.01.2004 | |||||||||
U # 2 | 0.8 MW | 25.01.2004 | |||||||||
U # 3 | 0.8 MW | 25.01.2004 | |||||||||
The Power generated in the station is at 6.3 kV. This is stepped up to 33 kV and transmitted to 110 kV substation, Thiruvambady. | |||||||||||
Generation in Mu for the last four years from Urumi-2 Power station | |||||||||||
Year | 2011-12 | 2012-13 | 2013-14 | 2014-15 | |||||||
Genearion in Mu | 5.026 | 3.942 | 5.188 | 4.915 | |||||||
10 | CHEMBUKADAVU- I SMALL HYDRO ELECTRIC PROJECT | ||||||||||
CHEMBUKADAVU- I WEIR | |||||||||||
River | Chalipuzha river | ||||||||||
Type of weir | Trench type diversion weir | ||||||||||
Catchment area | . | 20.5 sq. km | |||||||||
CHEMBUKADAVU- I POWER STATION | |||||||||||
Location | Chembukadavu- near Thusharagiri | ||||||||||
Village | Kodenchery | ||||||||||
Panchayath | Kodenchery | ||||||||||
Post office | Nooranthode P.O | ||||||||||
Taluk | Thamarassery | ||||||||||
District | Kozhikode | ||||||||||
Installed capacity | ( 3 x 0.9 MW)= 2.7 MW | ||||||||||
Annual generation capability | 6.59 MU | ||||||||||
Turbine | Horizontal Francis | ||||||||||
Avearge net effective head | 35.50 m | ||||||||||
Water required for 1 MU generation | 12.22 MCM | ||||||||||
Full load discharge of 1 machine | 3.06 m3/ sec | ||||||||||
The units were commissioned on 19.08.2003 | |||||||||||
Unit | Rating | Date of Commssioning | |||||||||
U # 1 | 0.9 MW | 19.08.2003 | |||||||||
U # 2 | 0.9 MW | 19.08.2003 | |||||||||
U # 3 | 0.9 MW | 19.08.2003 | |||||||||
After power generation, water from the power station is utilised for Chembukadavu II. The Power generated in the station is at 6.3 kV. This is stepped up to 33 kV and transmitted to 110 kV substation, Agasthyamoozhy. | |||||||||||
Generation in Mu for the last four years from Chembukadavu- 1 Power station | |||||||||||
Year | 2011-12 | 2012-13 | 2013-14 | 2014-15 | |||||||
Genearion in Mu | 4.691 | 3.861 | 4.895 | 4.271 | |||||||
11 | CHEMBUKADAVU- II SMALL HYDRO ELECTRIC PROJECT | ||||||||||
CHEMBUKADAVU- II WEIR | |||||||||||
River | Chalippuzha | ||||||||||
Type | Trench type, Diversion weir | ||||||||||
CHEMBUKADAVU- II POWER STATION | |||||||||||
Location | Chembukadavu | ||||||||||
Village | Kodenchery | ||||||||||
Panchayath | Kodenchery | ||||||||||
Post office | Chembukadavu-P.O | ||||||||||
Taluk | Thamarasssery | ||||||||||
District | Kozhikode | ||||||||||
Installed capcity | 3 x 1.25 MW = 3.75 MW | ||||||||||
Firm Annual generation Capability | 9.03 MU | ||||||||||
Turbine | Horizontal Francis | ||||||||||
Avearge net effective head | 55 m | ||||||||||
Water required for 1 MU generation | 7.75 MCM | ||||||||||
Full load discharge | 2.69 m3/ Sec | ||||||||||
The units were commissioned on 04.09.2003 | |||||||||||
Unit | Rating | Date of Commssioning | |||||||||
U # 1 | 1.25 MW | 04.09.2003 | |||||||||
U # 2 | 1.25 MW | 04.09.2003 | |||||||||
U # 3 | 1.25 MW | 04.09.2003 | |||||||||
After power generation, water from the power station is flowing to Chaliyar river. The Power generated in the station is at 6.3 kV. This is stepped up to 33 kV and transmitted to 110 kV substation, Agasthyamoozhy. | |||||||||||
Generation in Mu for the last four years from Chembukadavu-2 Power station | |||||||||||
Year | 2011-12 | 2012-13 | 2013-14 | 2014-15 | |||||||
Genearion in Mu | 7.366 | 5.639 | 7.580 | 6.674 | |||||||
12 | CHIMMONY SMALL HYDRO ELECTRIC PROJECT | ||||||||||
The project utilizes the irrigation release of Chimmony dam owned by the Irrigation Dept. in Chimmony river, a tributary of Karuvannur river. The dam was constructed by PWD during 1980’s. Power house was constructed near the toe of the dam. | |||||||||||
River | Chimmony river | ||||||||||
Dam | Chimmony | ||||||||||
Location | Thrissur | ||||||||||
Panchayath | Varantharappally | ||||||||||
District | Thrissur | ||||||||||
Installed capcity | 1 x 2.5 MW | ||||||||||
Firm Annual generation Capability | 6.7 MU | ||||||||||
Prime mover | Horizontal Francis Turbine | ||||||||||
Avearge net effective head | 45.46 m | ||||||||||
Water required for 1 MU generation | |||||||||||
Power evacuation | 11 kV ABC to 66kV Puthukkad S/S (approx. 25kM) – work in progress. | ||||||||||
official inauguration of the Project conducted on 22/05/2015 ,Time extension given upto 31-07-2015 | |||||||||||
13 | ADYANPARA SMALL HYDRO ELECTRIC PROJECT | ||||||||||
The project envisages power generation.by utilizing the potential of the stream, Kanjirappuzha, a tributary of Chaliyar located in Nilambur taluk of Chaliyar Panchayat in Malappuram. | |||||||||||
. | |||||||||||
Unit | Rating | Date of commissioning | |||||||||
Unit # 1 | 1.5 MW | 09/03/2015 | |||||||||
Unit # 2 | 1.5 MW | 09/03/2015 | |||||||||
Unit # 3 | 0.5 MW | 09/03/2015 | |||||||||
River | Kanjirappuzha | ||||||||||
Panchayath | Chaliyar | ||||||||||
Taluk | Nilambur | ||||||||||
District | Malappuram | ||||||||||
Installed capcity | 3.5 MW | ||||||||||
Firm Annual generation Capability | 9.01 MU | ||||||||||
Generating voltage: | 3.3 kV | ||||||||||
Prime mover | Horizontal Francis Turbine | ||||||||||
Avearge head | 94m | ||||||||||
Power evacuation | 13.5km 33kV SC line to 66kV Nilambur S/S & 9.5 km 33kVSC line to propose 33kV Pothukal S/S. |