- 1912 or +91471 2555544

Small Hydro Electric Projects

1 KALLADA HYDRO ELECTRIC PROJECT
The Kallada power station utilises the water release from Kallada Irrigation Reservoir. Kallada power station is the first of its kind in Kerala in utilising the water for irrigation release for power generation. The dam is owned by the Irrigation Department . After power generation, water from the power station is released to the Kallada River. From there it is diverted to irrigation canal by diversion weir during irrigation seasons The Power generated in the station is evacuated through two 66 kV feeders.
Kallada Reservoir
Water Spread Area 13.72 Sq. Km.
Catchment Area 549.52 Sq. Km.
Average Rainfall 3098 mm
Full Reservoir Level (FRL) 115.82 m
Minimum Drawdown level (MDDL) 78 m
Effective Storage at FRL 472 MCM
Energy Equivalent at FRL 48.41 MU
KALLADA POWER STATION
Location Dam toe of Kallada Irrigation Dam
Village Thenmala
Taluk Punalur
District Kollam
Installed capacity 15 MW ( 2x7.5 MW)
Firm Annual Generation Capablity 65 MU
Prime mover Vertical shaft Keplan
Avearge net effective head 43m
Water required for 1 MU generation 9.75 MCM
Full load discharge of 1 machine 20.32 m3/ Sec
Unit Rating Date of Commssioning
U # 1 7.5 MW 05.01.1994
U # 2 7.5 MW 05.09.1994
Generation in Mu for the last six years from Kallada Power station
Year 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15
Generation in MU 60.41 72.250 65.62 21.81 67.76 68.99
2 PEPPARA SMALL HYDRO ELECTRIC PROJECT
The reservoir for the project is formed by Peppara Dam across Karamana river owned by Kerala Water Authority .Tail race dischrge: After power generation, water from the power station is released to the Karamana River and collected at Aruvikkara dam for domestic water supply to Thiruvananthpuram city .The Power generated in the station is at 11 kV and is directly connected to the 11 kV feeder to 66 kV Palode Substation.
PEPPARA DAM
Water Spread Area 8.496 Sq. Km.
Catchment Area 86 Sq. Km.
Full Reservoir Level (FRL) 110.5 m
Minimum Drawdown level (MDDL) 82.25 m
Effective Storage at FRL 68.4 MCM
Energy Equivalent at FRL 3.5 MU
PEPPARA POWER STATION
Place Peppara
Village Vithura
Taluk Nedumangad
District Thiruvananthapuram
Installed capacity (1 x 3 MW)= 3 MW
Annual Generation capablity 11.50 Mu
Prime mover S type Kaplan
Average net effective head 25 metre
water required for 1 MU generation 19.55 MCM
Full load dischage 16.30 m3 / Sec
Unit Rating Date of Commssioning
U # 1 3 MW 15.06.1996
Generation in Mu for the last six years from Peppara Power stations
Year 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15
Generation in MU 6.04 9.75 8.19 3.69 7.59 5.37
3 LOWER MEENMUTTI SMALL HYDRO ELECTRIC PROJECT
The reservoir for the project is formed by Lower Meenmuuty weir across Vamanapuram river in Kallar basin.The power generation is at 3.3 kV. This is stepped up to 11 kV and transmitted to 66 kV substation Palode. After power generation, water from the power station is released to the Vamanapuram River.
LOWER MEENMUTTY WEIR
Catchment Area . 102.4 Sq. Km
Average Rainfall 3138 mm
Full Reservoir Level (FRL) 62.75 m
Minimum Drawdown level (MDDL) 61.3 m
LOWER MEENMUTTY POWER STATION
Place Lower Meenmutty
Village Palode
Taluk Nedumangad
District Thiruvananthapuram
Installed capacity (1 x 0.5MW +2 x1.5 MW)= 3.5 MW
Annual Generation capablity 7.63MU
Prime mover Horizontal S type Full Kaplan
Aveage net effective head 13 metre
water required for 1 MU generation 35.9 MCM
Full load dischage 14.98 m3 / Sec for 1.5 MW machine
Full load dischage 4.99m3/ sec for 0.5 MW machine
Unit Rating Date of Commssioning
U # 1 0.5 MW 11.08.2006
U # 2 1.5 MW 05.06.2006
U # 3 1.5 MW 02.05.2006
Generation in Mu for the last six years from Lower Meenmutty Power stations
Year 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15
Generation in MU 3.42 7.19 4.86 2.15 5.41 5.75
4 PEECHI SMALL HYDRO ELECTRIC PROJECT
The Peechi Dam under Irrigation Department constructed across Manali river makes the reservoir for this project. Generation is from the water released for irrigation. Hence generation is pnly in the irrigation seasons only. The power generation is at 3.3 kV. This is stepped up to 11 kV and transmitted over two 11 kV feeders.
PEECHI Reservoir
Water Spread Area 12.95 Sq. Km.
Full Reservoir Level (FRL) 79.25 m
Minimum Drawdown level (MDDL) 68.8 m
Effective Storage at FRL 112.607 MCM
Energy Equivalent at FRL 3.21 MU
PEECHI POWER STATION
Location Peechi dam toe
Village Peechi
Panchayath Panacherry
Taluk Thrissur
District Thrissur
Installed capcity 1 x 1.25 MW
Firm annual design energy 3.31 MU
Average net head 22.75 metre
Prime mover Horizontal shaft Keplan
Water required for 1 MU generation 18.172 MCM
Full load dischage 6.31 m3 / Sec
Date of commissioning of the unit 7-1-2013
Generation in Mu for the last 3 years from Peechi SHEP
Year 2012-13 2013-14 2014-15
Genearion in Mu 0.263 3.284 1.924
5 POOZHITHODE SMALL HYDRO ELECTRIC PROJECT
The waters of Illyanipuzha and Kadantharappuzha are utilised for the project. Overflow type diversion weir is constructed across the river. The Power generated in the station is at 3.3 kV. This is stepped up to 33 kV for evacuation.
Poozhithode weir
Catchment Area 26 Sq. Km.
Average Rainfall 4706 mm
Full Storage Level 270.21 m
Minimum Drawdown level (MDDL) 266.71 m
Poozhithode Power Station
Village Maruthonkara
Panchayath Maruthonkara
Taluk Vadakara
District Kozhikode
Installed capcity 3 x 1.6 MW=4.8 MW
Annual generation capability 10.97 MU
Prime mover Horizontal shaft Francis
Average net head 72m
water required for 1 MU generation 8.67 MCM
Full load discharge of 1 machine 3.85m3/ Sec
Unit Rating Date of commissioning
U # 1 1.6 MW 25-6-2011
U # 2 1.6 MW 25-6-2011
U # 3 1.6 MW 25-6-2011
Generation in Mu for the last 4 years from Poozhithode SHEP
Year 2011-12 2012-13 2013-14 2014-15
Genearion in Mu 9.362 10.670 11.969 11.329
6 VILANGAD SMALL HYDRO ELECTRIC PROJECT
The Station has 3 units of 2.5 MW (Installed capacity - 7.5 MW). The project uses water of the Kavadi puzha and Vaniyam puzha, both tributaries of Mahe river. After power generation, water from the power station is released to the Vaniampuzha river which finaly reaches Mahe river. The power generation is at 3.3 kV. This is stepped up to 33 kV and transmitted to 110 kV Nadapuram substation through 33 kV UG cable.
Weir
No of weirs 2 ( in Vaniampuzha & in Kavadippuzha)
Catchment Area 38.6 Sq. Km.
Average Rainfall 3851 mm
Location Vilangad
Village Vilangad &Thinur
Panchayath Vanimel and Narippatta
Taluk Vadakara
District Kozhikode
Installed capacity 3 x 2.5 MW=7.5 MW
Firm annual generation capability 22.63MU
Prime mover Horizontal Francis
Average net effective head at power house 99m
Water required for 1 MU generation 4.14 MCM
Full load discharge 2.875 m3/ Sec
Unit Rating Date of Commssioning
U # 1 2.5 MW 01.09.2014
U # 2 2.5 MW 01.09.2014
U # 3 2.5 MW 01.09.2014
Generation in Mu for the last year from Vilangad Power station
Year 2014-15
Genearion in Mu 7.16
7 MALAMPUZHA SMALL HYDRO ELECTRIC PROJECT
Located at Malampuzha in Palakkad Taluk of Palakkad District. Malampuzha dam constructed across Malapuzha river forms the reservoir for this project. The station utilises the irrigation release for the left bank canal together with spill. The 2.5 MW machine is usually operated during the period November - January. The annual generation potential is 5.6 MU. Turbine is horizontal shaft Kaplan. The machine was commissioned on 26.11.2001. The dam is owned by Irrigation Department . The water released for Irrigation is used for generation.The power generation is at 11 kV and distributed through 1 No 11 k.V feeder
MALAMPUZHA DAM
Water Spread Area 22.01 Sq. Km.
Catchment Area 147.63 Sq. Km.
Full Reservoir Level (FRL) 115.09 m
Minimum Drawdown level (MDDL) 99.5 m
Effective Storage at FRL 236.7 MCM
Malampuzha Power Station
Location Malampuzha Garden
Village Malamapuzha - II
Taluk Palakkad
District Palakkad
Installed Capacity 1X2.5 MW= 2.5 MW
Firm annual generation capability 5.6 MU
Avaerage net effective head 14.4m
Prime mover Horizontal Kaplan
Water required for 1 MU generation 28.24 MCM
Generation in Mu for the last five years from Malampuzha Power station
Year 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15
Genearion in Mu 0.00 0.00 2.77 1.903 4.361 5.19
8 URUMI -I SMALL HYDRO ELECTRIC PROJECT
Urumi weir
River Eruvanchippuzha
type Trench type, Diversion weir
Catchment area . 16.67 sq. km
Location Poovaranthode/ Urumi
Village Koodaranji
Panchayath Koodaranji
Post office Kuliramvetty P.O
Taluk Kozhikode
District Kozhikode
River Poovaranthode; Overflow weir
Installed Capacity 3.75 MW (3 x 1.25 MW)
Annual generation capablity 9.72 MU
Prime mover Horizontal Francis Turbine
Average head at power house 96.5 m
Water required for 1 MU generation 4.47 MCM
Full load dischrge of 1 machine 1.553 m3/Sec
Unit Rating Date of Commssioning
U # 1 1.25 MW 25.01.2004
U # 2 1.25 MW 25.01.2004
U # 3 1.25 MW 25.01.2004
After power generation, water from the power station is utilised for Urumi II. The Power generated in the station is at 6.3 kV. This is stepped up to 33 kV and transmitted to 110 kV substation, Agasthyamoozhy.
Generation in Mu for the last four years from Urumi-1 Power station
Year 2011-12 2012-13 2013-14 2014-15
Genearion in Mu 8.29 6.655 8.599 8.068
9 URUMI -II SMALL HYDRO ELECTRIC PROJECT
Urumi -2 weir
River Eruvanchippuzha
type Trench type, Diversion weir
URUMI -II POWER STATION
Location Poovaranthode/ Urumi
Village Thiruvambady
Panchayath Thiruvambady
Post office Punnackal P.O
Taluk Kozhikode
District Kozhikode
River Poyilingappuzha; Overflow weir
Installed capacity 3 x0.8 MW=2.4 MW
Annual generation capablity 6.28 MU
Prime mover Horizontal shaft Francis
Average head at power house 55 m
Water required for 1 MU generation 7.98 MCM
Full load discharge of 1 machine 1.77m3/ Sec
The units were commissioned on 25.01.2004
Unit Rating Date of Commssioning
U # 1 0.8 MW 25.01.2004
U # 2 0.8 MW 25.01.2004
U # 3 0.8 MW 25.01.2004
The Power generated in the station is at 6.3 kV. This is stepped up to 33 kV and transmitted to 110 kV substation, Thiruvambady.
Generation in Mu for the last four years from Urumi-2 Power station
Year 2011-12 2012-13 2013-14 2014-15
Genearion in Mu 5.026 3.942 5.188 4.915
10 CHEMBUKADAVU- I SMALL HYDRO ELECTRIC PROJECT
CHEMBUKADAVU- I WEIR
River Chalipuzha river
Type of weir Trench type diversion weir
Catchment area . 20.5 sq. km
CHEMBUKADAVU- I POWER STATION
Location Chembukadavu- near Thusharagiri
Village Kodenchery
Panchayath Kodenchery
Post office Nooranthode P.O
Taluk Thamarassery
District Kozhikode
Installed capacity ( 3 x 0.9 MW)= 2.7 MW
Annual generation capability 6.59 MU
Turbine Horizontal Francis
Avearge net effective head 35.50 m
Water required for 1 MU generation 12.22 MCM
Full load discharge of 1 machine 3.06 m3/ sec
The units were commissioned on 19.08.2003
Unit Rating Date of Commssioning
U # 1 0.9 MW 19.08.2003
U # 2 0.9 MW 19.08.2003
U # 3 0.9 MW 19.08.2003
After power generation, water from the power station is utilised for Chembukadavu II. The Power generated in the station is at 6.3 kV. This is stepped up to 33 kV and transmitted to 110 kV substation, Agasthyamoozhy.
Generation in Mu for the last four years from Chembukadavu- 1 Power station
Year 2011-12 2012-13 2013-14 2014-15
Genearion in Mu 4.691 3.861 4.895 4.271
11 CHEMBUKADAVU- II SMALL HYDRO ELECTRIC PROJECT
CHEMBUKADAVU- II WEIR
River Chalippuzha
Type Trench type, Diversion weir
CHEMBUKADAVU- II POWER STATION
Location Chembukadavu
Village Kodenchery
Panchayath Kodenchery
Post office Chembukadavu-P.O
Taluk Thamarasssery
District Kozhikode
Installed capcity 3 x 1.25 MW = 3.75 MW
Firm Annual generation Capability 9.03 MU
Turbine Horizontal Francis
Avearge net effective head 55 m
Water required for 1 MU generation 7.75 MCM
Full load discharge 2.69 m3/ Sec
The units were commissioned on 04.09.2003
Unit Rating Date of Commssioning
U # 1 1.25 MW 04.09.2003
U # 2 1.25 MW 04.09.2003
U # 3 1.25 MW 04.09.2003
After power generation, water from the power station is flowing to Chaliyar river. The Power generated in the station is at 6.3 kV. This is stepped up to 33 kV and transmitted to 110 kV substation, Agasthyamoozhy.
Generation in Mu for the last four years from Chembukadavu-2 Power station
Year 2011-12 2012-13 2013-14 2014-15
Genearion in Mu 7.366 5.639 7.580 6.674
12 CHIMMONY SMALL HYDRO ELECTRIC PROJECT
The project utilizes the irrigation release of Chimmony dam owned by the Irrigation Dept. in Chimmony river, a tributary of Karuvannur river. The dam was constructed by PWD during 1980’s. Power house was constructed near the toe of the dam.
River Chimmony river
Dam Chimmony
Location Thrissur
Panchayath Varantharappally
District Thrissur
Installed capcity 1 x 2.5 MW
Firm Annual generation Capability 6.7 MU
Prime mover Horizontal Francis Turbine
Avearge net effective head 45.46 m
Water required for 1 MU generation
Power evacuation 11 kV ABC to 66kV Puthukkad S/S (approx. 25kM) – work in progress.
official inauguration of the Project conducted on 22/05/2015 ,Time extension given upto 31-07-2015
13 ADYANPARA SMALL HYDRO ELECTRIC PROJECT
The project envisages power generation.by utilizing the potential of the stream, Kanjirappuzha, a tributary of Chaliyar located in Nilambur taluk of Chaliyar Panchayat in Malappuram.
.
Unit Rating Date of commissioning
Unit # 1 1.5 MW 09/03/2015
Unit # 2 1.5 MW 09/03/2015
Unit # 3 0.5 MW 09/03/2015
River Kanjirappuzha
Panchayath Chaliyar
Taluk Nilambur
District Malappuram
Installed capcity 3.5 MW
Firm Annual generation Capability 9.01 MU
Generating voltage: 3.3 kV
Prime mover Horizontal Francis Turbine
Avearge head 94m
Power evacuation 13.5km 33kV SC line to 66kV Nilambur S/S & 9.5 km 33kVSC line to propose 33kV Pothukal S/S.