Manufacture and supply of 8m/140kg PSC poles - Special Leave Petition No.6908-6909/2022 filed by M/s. Sivasakthi Engineering and Fabricators (P) Ltd. and others before the Hon'ble Supreme Court of India Manufacture and supply of 8m/140kg PSC poles - Special Leave Petition No.6908-6909/2022 filed by M/s. Sivasakthi Engineering and Fabricators (P) Ltd. and others before the Hon'ble Supreme Court of India

Manufacture and supply of 8m/140kg PSC poles - Special Leave Petition No.6908-6909/2022 filed by M/s. Sivasakthi Engineering and Fabricators (P) Ltd. and others before the Hon'ble Supreme Court of India - Judgement dated 01.05.2023 of the Hon'ble Supreme Court - Sanctioned - Orders issued. (BO (FTD)No.446/2023 Dated: 16.10.2023).