- 1912 or +91471 2555544

Download details
Implementation of 50 MW Floating Solar Project at West Kallada under Ultra Mega Renewable Energy Power Park (UMREPP) by NHPC- cancellation of lease deed - sanction accorded — Orders issued. Implementation  of  50  MW  Floating  Solar  Project  at  West  Kallada    under   Ultra Mega  Renewable  Energy  Power  Park  (UMREPP)  by  NHPC-   cancellation  of  lease deed - sanction  accorded  — Orders issued.

Implementation  of  50  MW  Floating  Solar  Project  at  West  Kallada    under   Ultra Mega  Renewable  Energy  Power  Park  (UMREPP)  by  NHPC-   cancellation  of  lease deed - sanction  accorded  — Orders issued.

Data

Size2.33 MB
Downloads473
Created22-08-2023

Download