- 1912 or +91471 2555544

Download details
Integration of the existing Solar Plants with the Data Center-Allocating SIM for the 12 sites in connection with installation of Data Acquisition Svstem - Sanctioned- Orders issued.  Integration of the existing Solar Plants with the Data Center-Allocating SIM for the 12 sites in connection with installation of Data Acquisition Svstem - Sanctioned- Orders issued.

Establishrnenr of Renewable Energy Data Center at 9th floor, Vydyuthibhavanam Thiruvanathapuram. Integration of the existing Solar Plants with the Data Center-Allocating SIM for the 12 sites in connection with installation of Data Acquisition Svstem - Sanctioned- Orders issued.

Data

Size244.36 KB
Downloads720
Created13-07-2023

Download