- 1912 or +91471 2555544

Download details
Travancore Lines Package under TransGrid 2.0-Laying of 12 km of 110 kV, 630 mm2 single core UG cable from Vizhinjam substation to 110 kV Muttathara substation and laying of 19.5 km of 110 kV, 630 mm2 single core UG cable Travancore Lines Package under TransGrid 2.0-Laying of 12 km of 110 kV, 630 mm2 single core UG cable from Vizhinjam substation to 110 kV Muttathara substation and laying of 19.5 km of 110 kV, 630 mm2 single core UG cable

Travancore Lines Package under TransGrid 2.0-Laying of 12 km of 110 kV, 630 mm2 single core UG cable from Vizhinjam substation to 110 kV Muttathara substation and laying of 19.5 km of 110 kV, 630 mm2 single core UG cable from Vizhinjam substation to 110 kV Veli substation for improving connectivity-Administrative Sanction accorded.

Data

Size295.95 KB
Downloads1,140
Created30-05-2020
Changed30-05-2020

Download